Tel: +86 (0755) 2780 4910
Productivity advantages:
1. Have a complete set of smart wearable processing equipment for efficient production; such as: fully automatic embroidery machine, high-frequency inverter spot welding machine, computer cutting machine, fully automatic wire stripping machine, automatic soldering machine, traceless welding machine, laser engraving machine , computer sewing machine, etc.
2. With the development of the company in recent years, the production efficiency is ≥98%, the through rate is ≥95%, and the plan completion rate is ≥98% to meet customer needs.
3. Have excellent production capacity and lean manufacturing: strengthen informatization, streamline the system, and continue to promote lean production.
4. Improve the employee training mechanism: train employees so that they can better understand and master the principles and methods of lean production to improve production efficiency.
Electric heating products: 30,000 pairs of electric heating gloves/month, 10,000 pairs of electric heating socks/month, 10,000 pairs of electric heating clothes/month, 10,000 pairs of electric heating hats/month
Ordinary socks: 40,000-50,000 pairs a day
Heating socks: 2,000-3,000 pairs per day (need to be fully inspected and produced according to quality requirements)
Sample:
1. Existing yarn: 1-2 days
2. Dingran yarn: 4-5 days
Mass production (customized):
500 - 1000: 2-3 days
10K -50K: 10-25 days
50K -100K: 25-35 days
100K: 35-40 days
* Electric heating products: electric heating socks/electric heating clothes/electric heating blankets etc.
sample:
1.Delivery time: 3-7 days
Mass production (customized):
500 - 1000: 7-10 days
10K -50K: 60 days
50K -100K: 120 days
Electric heating socks total production and delivery date
Sample:
1. Our style: 3-5 days (working days)
2. Customized styles: 15-20 days (working days)
Accessories: switch - 10 days for customized IC, 15 days for custom mold opening, 4 days for pure laser engraving of existing styles
Battery - 20 days for mold opening, 3 days for existing batteries
Socks: 7-10 days for customization
Mass production (customized): 45-60 days (working days)
1. Our style: 15-20 days (working days)
2. Customized styles: 45-60 days (working days)
Accessories: Switch -- 25-30 days (mold opening, new IC)
Battery - 45-60 days (mold opening, new IC)
Socks: 10 days
Quality control management advantages:
1. The company has passed the IS9001 quality system and effectively implemented, operated and supervised it.
2. High product pass-through rate: mobilize all employees to participate in quality to ensure that quality work is smoothly carried out and promoted within the company
3. Have a complete system to evaluate customer quality requirements and new product introduction information from each section of PFMEA-DFMEA-QC engineering drawings
4. Have complete reliability tests and customer use simulation tests: high/low temperature test, swing test, aging test, high voltage test, high-precision battery comprehensive tester, high-precision temperature tester, etc.